毛片免费无码视频-毛片免费在线观看-毛片内射-毛片内射久久久一区-毛片女人毛片一级毛片毛片-毛片女人十八以上观看

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution
Application area

Shanghai industrial boilers provide a one to one solution for different industry attributes and needs of customer enterprises.



Engineering generalcontractor

Shanghai industrial boiler is also committed to providing customers with energy conservation and environmental protection boiler project package solution.

Power station boiler EPC package
Shanxi Gaoyi Iron and Steel Co., Ltd. 15MW high temperature and extra high pressure gas power generation project
Unit operation mode:

A 190t/h high-temperature ultra-high pressure gas boiler (blast furnace gas mixed with converter gas) +1 15MW high-temperature ultra-high pressure back pressure steam turbine unit, steam turbine back pressure parameters: 3.9MPa (a), ~ 373 °C. The back pressure of the steam turbine is returned to the boiler reheater, and the steam temperature is raised to 450 ° C and sent to the steam blower of the steel mill.

Fuel fuel:Mixed gas of blast furnace gas and converter gas
Ignition method:Liquefied gas ignition

In principle, the boiler operates at base load, but has variable load peaking capability. The boiler has good adaptability to the sliding pressure operation and the constant pressure operation.

The time from ignition to full load of the boiler meets the following requirements under normal starting conditions:

Cold start (stop more than 72h)6~8 hours

Warm start (stop 10-72h)3~4 hours

Hot start (within 10 hours of shutdown)1.5~2 hours

Temperature adjustment method:The superheated steam is cooled by two-stage water spray; the reheated steam is cooled by a small amount of water spray.

The service life of the boiler is 30 years, and the life of the convective heating surface flushed by the smoke is more than 120,000 hours. The overhaul interval is 5 years.

The project has been put into operation according to the installation, and all the indicators have reached the predetermined requirements.



Boiler modification

Shanghai industrial boilers can be retrofitted by assembling a Seiko retrofitting team, which can be customized according to customer requirements according to local conditions.

With the continuous improvement of national energy policy and environmental protection requirements, Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. have carried out in-depth research and development on the transformation of coal-fired boilers.

Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. are willing to customize various boiler renovation solutions for the majority of users.
In order to improve the performance of the original boiler and reduce the emission concentration of the boiler, for the country's energy-saving and environmental protection cause to make due contributions.


Equipment installation

The quality of the engineering installation directly determines its effect after being put into use.

×
主站蜘蛛池模板: 人与动动物xxxx毛片人与狍 | 国产精品无码一区二区牛牛 | 欧美精产国品一二三产品测评 | 国产成人精品免费视频网页大全 | 91精品欧美综合在线野草社区 | 日本免费一区二区在线观看 | 成 人 黄 色 免费 网站无毒 | 少妇丰满大乳被男人揉捏视频 | av毛片国产精品 | 在线免费观看一区二区三区 | 精品国产乱码久久久久久浪潮小说 | 日本波多野结衣在线 | 成人A片一区二区三区在线观看 | 中文字幕无码日韩专区 | 亚洲国产精品不卡毛片a在线 | 91热久久免费频精品99欧美 | 日本欧美日韩中文字幕 | a网站在线观看免费网站 | 成人自拍视频网站 | 亚洲制服另类 | 久久精品视频全国免费看 | 国产色精品久久人妻无码看片 | 香蕉久久久久久狠狠色 | 天堂资源中文最新版在线 | 日韩精品国产自在久久现 | 国产伦理精品一二三 | 久久精品AV无码一区二区小说 | 日韩亚洲中文字幕第一页 | 天天干 天天日 天天操 | 国产激情精品一区二区三区 | 秋霞在线观看视频一区二区三区 | 91综合7799 | 免费视频91| 色一性一乱一伦一一区二区三区 | 精品无码人妻一区二区三区品 | 久久综合久久鬼 | 日本激情视频一区二区三区 | 不卡无码人妻一区二区三区 | 亚洲一区二区三区视频 | 日韩欧美~中文字幕无敌色 日韩欧国产精品一区综合无码 | 日本工口里画番全彩 |