毛片免费无码视频-毛片免费在线观看-毛片内射-毛片内射久久久一区-毛片女人毛片一级毛片毛片-毛片女人十八以上观看

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 16515

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 国产线视频精品免费观看视频 | 丝袜无码一区二区三区 | 韩国三级大全久久网站中文字幕 | 久久免费区一区二区三波多野 | 精品国产乱码久久久久久毛片 | 欧美亚洲日本一区 | 久久久久影院美女国产主播 | 诱人的女邻居BD在线观看 | 欧美国产日韩第三页 | 成人久久内射人妻 | 欧美一级做影片爱橙影院 | 丁香婷婷开心激情深爱五月 | 性欧美老人牲交xxxxx视频 | 国产无遮挡A片又黄又爽小说 | 日本国产一区二区三区在线观 | 久久久男人的天堂 | 自慰 日韩在线 | 麻豆AV无码精品一区二区 | 精品自拍视频在线观看 | 亚洲精品一区二区三区早餐 | 国产69精品麻豆久久久久 | 国产一区二区亚洲精品 | 中文字幕一区二区在线观看 | 亚洲精品无码国产一区二区 | 欧美有码在线 | 久久五月天婷综合 | 欧亚乱熟女一区二区在线 | 亚洲性久久 | 亚洲v欧美v国产v在线观看不卡 | 国产一级一国产一级毛片 | 亚洲 校园 欧美 国产 另类 | 欧美一级久久精品 | 欧美大鸡巴久久久久久久久久久 | 精品人妻无码一区二区三区VOD | av免费播放一区二区三区 | 四虎影视884a精品国产古代 | 亚洲欧美另类图片 | 日韩中文字幕精品在线 | 亚洲无码精品在线观看 | 国产69精品久久久久999三级 | 东京热毛片无码dvd一二三区 |